Free Web space and hosting from yearbookhigh.com
Search the Web

  New Life for Midnszenty High
     
Homeroom

Remember the Good Times

Legend of a Lady

Best DHS Nicknames

Old School Memories

Remember These

Ahhhhhh Memories

1940s Memories

More 1940s

Still More 1940s

1950s Memories

More 1950s

Still More 1950s

1960s Memories

More 1960s

Still More 1960s

Dunkirk Industrial High

Dunkirk Industrial Moments

DHS Emails 1935-1959

DHS Email 1960-1972

Point Gratiot...everyone's favorite

Links to Dunkirk

A Look Back

New Life for Midnszenty High

New Life for Mindszenty High #2

 
Here's some pictures I took of the during the summer of 2005 of the restoration work being down at Mindszenty High

I have only been inside Mindszenty High School a few times and don't know the layout well at all...so I'll do my best to discribe what these picture show...but it wii just be a guess as to what was in that location back when it was your School.

If someone recognizes something that I have incorrectly labeled...please drop me a line and I'll be happy to correct it ...I have a bunch of pictures (I was given complete access to the construction site ) so if there is an area of the School my pictures don't show...write me and I may have what your looking for.

Hope you enjoy a look at your old High School!                                     Tim Donnelly   DHS 1970

                                                                                   DetentionWiz@yahoo.com


Front of the School during construction
July 2005

hallway leading from the gym
Gym ...looking at the door to Eagle Street
looking at what was the stage in the Gym
Side door behind Gross Mansion.
new hole cut in floor for elevator shaft

I'm directly over the stage area looking west down into the gymnasium

ground floor
2nd floor classroom looking north
framing for an apartment goes up in the gym
Gym will become 2 levels with apartments on both floors
framing for apartments continues on 2nd floor
holes for new dormers are cut in the gym roof
windows are expanded to allow 2nd floor
ready to install the dormers
new dormers are installed and now the roof

Big summer rain storm expected in Dunkirk by evening....everyone works on getting the roof done!

filling in the brick around the new windows